Skip to main content
... LOS ANGELES
  • 311 City Services
  • LA City Directory
  • Chapter 1 - Overview of Project Delivery
    • 1.1 Introduction
    • 1.2 Phases of a Project
    • 1.3 Project Delivery Flowchart
    • 1.4 Program Master Schedules
    • 1.5 Program Oversight Committee
    • 1.6 Community and Neighborhood Council Involvement
    • 1.7 Client Satisfaction
  • Chapter 2 - Project Delivery Methods
    • 2.1 Introduction
    • 2.2 Design/Bid/Build
    • 2.3 Design/Build
    • 2.4 Construction by City Forces
  • Chapter 3 - Initiating a Project
    • 3.1 An Overview of Project Initiation
    • 3.2 Opening a Work Order
    • 3.3 Obtaining Funding
    • 3.4 Defining Scope
    • 3.5 Selecting the Project Team
    • 3.6 Establishing a Memorandum of Understanding (MOU)
    • 3.7 Project Estimating
  • Chapter 4 - Change Control
    • 4.1 Control and Variance Analysis
    • 4.2 Risk Assessment and Risk Management
    • 4.3 Managing Scope Creep
  • Chapter 5 - Reporting Progress
    • 5.1 Uniform Project Reporting System
    • 5.2 Progress Reports
    • 5.3 Progress Meetings
    • 5.4 Public Information
    • 5.5 Use of City and BOE Websites
  • Chapter 6 - Using Consultants
    • 6.1 When to Use a Consultant
    • 6.2 Pre-Qualified On-Call or Project Specific Contract - Which to Use?
    • 6.3 Cost-Reimbursement or Lump Sum Contract - Which to Use?
    • 6.4 Procurement Process
    • 6.5 Contract Negotiations
    • 6.6 Standard Contract Requirements
    • 6.7 Contract Execution
    • 6.8 Managing Consultant Performance
    • 6.9 Paying for the Work - WBS and MBE/WBE and BIP Utilization
    • 6.10 Amending the Contract
    • 6.11 Consultant Performance Evaluations
    • 6.12 Closing the Contract
    • 6.13 Using the Pre-Qualified On-Call Consultants Lists
  • Chapter 7 - Pre-Design
    • 7.1 Formulation Phase and Analysis of Alternatives
    • 7.2 Identifying Property Needs
    • 7.3 Identifying Geotechnical Restraints
    • 7.4 Preliminary Environmental Review
    • 7.5 Preparing the Pre-Design Report
    • 7.6 Approval of the Pre-Design Report
  • Chapter 8 - Design Phase
    • 8.1 Plan Development Process
    • 8.1.1 Design Development for Public Buildings
    • 8.1.2 Design Development for Recreational Facilities
    • 8.1.3 Design Development for Street and Bridge Projects
    • 8.1.4 Design Development for Sewer and Storm Drain Projects
    • 8.1.5 Design Development for Air/Water Quality and Wastewater Treatment Projects
    • 8.2 Technical Specifications
    • 8.3 Site Surveying
    • 8.4 Geotechnical Report
    • 8.5 Utility Coordination
    • 8.6 Property Acquisition and Right of Entry
    • 8.7 Outsourced Design Services
    • 8.8 Typical Plan Set Requirements
    • 8.9 CADD Standards
    • 8.10 Traffic Planning
    • 8.11 Bidding Approaches
  • Chapter 9 - QA/QC During Design
    • 9.1 Introduction and Definitions
    • 9.2 Developing the QA/QC Plan
    • 9.3 Design Reviews
    • 9.4 Construction Review
    • 9.5 Operability and Maintainability Review
  • Chapter 10 - Project Specifications and Bid Proposal
    • 10.1 Master Specifications Concept
    • 10.2 Bid Proposal
    • 10.3 General Conditions
    • 10.4 General Requirements
    • 10.5 Technical Specifications
    • 10.6 The Greenbook
  • Chapter 11 - Permits and Approvals
    • 11.1 Introduction
    • 11.2 Environmental Clearance
    • 11.3 Plan Check Review and Permits from City Agencies
    • 11.4 Cultural Affairs Approval
    • 11.5 “1% for Arts” Program
    • 11.6 Regulatory Agency Approvals
    • 11.7 Approval to Advertise from Granting Agencies
  • Chapter 12 - Preparing the Bid Package
    • 12.1 Obtaining the Required Signatures
    • 12.2 Reviewing the Bid Documents
    • 12.3 Assembling the Bid Package
  • Chapter 13 - Advertising a Project for Bids
    • 13.1 Obtaining Board Approval to Advertise for Bids
    • 13.2 Advertising for Bids
    • 13.3 Bid Package Distribution and Control
    • 13.4 Pre-Bid Meeting and Job Walk
    • 13.5 Responding to Inquiries and Issuing Addend
  • Chapter 14 - Awarding the Construction Contract
    • 14.1 Receipt and Opening of Bids
    • 14.2 Evaluating Bids
    • 14.3 Contract Compliance Review
    • 14.4 Award by the Board of Public Works
    • 14.5 Processing Bonds and Insurance
    • 14.6 Escrow of Bid Documents
    • 14.7 Issuing the Notice to Proceed
  • Chapter 15 - The Bureau's Approach to Construction Management
    • 15.1 Construction Management Team
    • 15.2 Partnering
  • Chapter 16 - Construction Management Procedures
    • 16.1 Shop Drawings
    • 16.2 Request for Information
    • 16.3 Plan Clarification
    • 16.4 Substitution and “Or Equal” Proposals
    • 16.5 Construction Document Control
    • 16.6 Meetings
    • 16.7 Meeting Minutes
  • Chapter 17 - Inspection Procedures
    • 17.1 General
    • 17.2 Pre-Construction Inspections
    • 17.3 Inspection Staffing
    • 17.4 Inspection Documentation
    • 17.5 Inspection Reports
    • 17.6 Notices of Non-Compliance and Work Stoppage
    • 17.7 Job Memorandum
    • 17.8 Jobsite Interference
    • 17.9 Construction Photographs
    • 17.10 Shop Inspections
    • 17.11 Inspection by the Department of Building and Safety
    • 17.12 Materials Testing
    • 17.13 Construction Surveying
    • 17.14 Jobsite Safety
    • 17.15 Subcontractors
  • Chapter 18 - Construction Schedule Control
    • 18.1 Types of Schedules
    • 18.2 Obtaining an Approved Schedule
    • 18.3 Monthly Schedule Updates
    • 18.4 Analyzing Delays/Granting Time Extensions
    • 18.5 Assessing Liquidated Damage
  • Chapter 19 - Construction Cost Control
    • 19.1 Purpose and Principles
    • 19.2 Progress Payment Procedures
    • 19.3 Retention and Withholding
  • Chapter 20 - Construction Change Orders
    • 20.1 Introduction
    • 20.2 Initiating Change Orders
    • 20.3 Processing Preliminary Change Orders
    • 20.4 Finalizing Change Orders
    • 20.5 Allowance Orders
  • Chapter 21 - Avoiding and Mitigating Construction Disputes and Claims
    • 21.1 Request for Equitable Adjustment - Prevention
  • Chapter 22 - Construction Completion
    • 22.1 Partial Final Inspection and Partial Acceptance
    • 22.2 Sign-Off by the Department of Building and Safety
    • 22.3 Final Inspection by BCA
  • Chapter 23 - Emergency & Specialty Construction Contracts
    • 23.1 Emergency Contracts
    • 23.2 Pre-Authorized Emergency Contracts
    • 23.3 Specialty Construction Contracts
  • Chapter 24 - Facility Startup
    • 24.1 Overview of Facility Startup
    • 24.2 Equipment Installation and Testing
    • 24.3 Equipment & Facility Performance Testing
    • 24.4 Operations and Maintenance (O&M) Manuals
    • 24.5 Operations and Maintenance Training
    • 24.6 Warranties & Guaranties
    • 24.7 Spare Parts
  • Chapter 25 - Project Closeout
    • 25.1 Closeout Flowcharts & Checklists
    • 25.2 Record Drawings & As-Built Plans
    • 25.3 Final Retention Release
    • 25.4 Monumentation Survey
    • 25.5 Project Performance Report
    • 25.6 Contractor Performance Evaluation Report
    • 25.7 Acceptance Board Report
    • 25.8 Closing the Work Order
Type
Date modified
Title
Has the words
Help
Site MapStaff Login
  1. Home
  2. Chapter 18 - Construction Schedule Control

Chapter 18 - Construction Schedule Control


18.1 Types of Schedules
18.2 Obtaining an Approved Schedule
18.3 Monthly Schedule Updates
18.4 Analyzing Delays/Granting Time Extensions
18.5 Assessing Liquidated Damage